Holkarwadi TPS-4
- The Pune metropolitan Region Development Authority (PMRDA) has planned to undertake Holkarwadi TPS inorder to develop the Inner ring road for PMRDA area.
- The declaration of intention to prepare the Scheme is done under provisions of Maharashtra Regional and Town planning Act,1966(MRTP) Under section 60(1) dated 17/12/2018.
- Holkarwadi has been added to PMC Limit and PMRDA has been appointed as a Special Planning Authority for the area.
- Total Area of Final plots allotted to land owners: 77.70 ha (50.66%)
- Total area of Final Plots allotted to PMRDA: 48.91 ha (31.89%)
- Total area of Final Plots allotted to PMRDA for Open Spaces, Garden, Lake Development: 17.24 ha. (11.24%)
- Total area of Final Plots allotted for Public Amenities and Utilities: 07.95 ha. (05.18%)
- Total area of Final Plots allotted to PMRDA for sale: 09.27 ha. (06.05%)
- Total area of Final Plots allotted to PMRDA for E.W.S: 14.45 ha. (09.42%)
- Area under Roads: 26.77 ha.(17.45%)
- Draft T.P. Scheme has been sanctioned by dated 09/01/2020.
- Hearing of stakeholders is completed by the Arbitrator and Preliminary T.P. Scheme is submitted to State Government for approval.
| S.N. | Documents | Download |
|---|---|---|
| 1 | TPS-4 Resolution by Authority to Undertake Scheme | DownloadSize: 875 KB |
| 2 | TPS-4 Declaration of Intention to Prepare Scheme | DownloadSize: 1.18 MB |
| 3 | TPS-4 Gazette Notification for Publication of Draft TPS u/s 61(1) | DownloadSize: 1.42 MB |
| 4 | TPS-4 Gazette Notification for Sanction of Draft TPS u/s 68(2) | DownloadSize: 1.15 MB |
| 5 | TPS-4 Appointment of Arbitrator | DownloadSize: 792 KB |
| 6 | TPS-4 Publication of Preliminary Scheme | DownloadSize: 1.25 MB |
| 7 | TPS-4 Draft Sanctioned Plans, Report and Form-1 | DownloadSize: 2.47 MB |
| 8 | TPS-4 Preliminary Submitted Plans, Report | DownloadSize: 1.06 MB |
| 9 | TPS-4 Table A and B – Preliminary Scheme | DownloadSize: 1.54 MB |







