Autade Handewadi TPS-3
- The Pune metropolitan Region Development Authority (PMRDA) has planned to undertake Autade-Handewadi TPS inorder to develop the Inner ring road for PMRDA area.
- The declaration of intention to prepare the Scheme is done under provisions of Maharashtra Regional and Town planning Act,1966(MRTP) Under section 60(1) dated 17/12/2018.
- Autade-Handewadi has been added to PMC Limit and PMRDA has been appointed as a Special Planning Authority for the area.
- Total Area of Final Plots allotted to Land Owner: 42.34 ha.
- Total Area of Final Plots allotted to PMRDA: 28.25 ha.
- Total area of Final Plots allotted to PMRDA for Open Spaces, Garden, Lake Development: 06.62 ha.
- Total area of Final Plots allotted for Public Amenities and Utilities: 05.86 ha.
- Total area of Final Plots allotted to PMRDA for sale: 07.31 ha
- Total area of Final Plots allotted to PMRDA for E.W.S: 08.46 ha.
- Area under Roads: 14.06 ha.
- Undevelopable Area(Nala): 04.75 ha.
- Area under Govt. land(Vittewadi): 05.00 ha.
- Draft T.P. Scheme has been sanctioned by dated 09/01/2020.
- Hearing of stakeholders is completed by the Arbitrator and Preliminary T.P. Scheme is submitted to State Government for approval.
| S.N. | Documents | Download |
|---|---|---|
| 1 | Draft Sanctioned Plan, Report and Form-1 | DownloadSize: 2.45 MB |
| 2 | Preliminary Submitted Plan, Report, Table A and Table B | DownloadSize: 1.82 MB |
| 3 | Resolution by Authority to Undertake the Scheme | DownloadSize: 850 KB |
| 4 | Declaration of Intention to Prepare the Scheme | DownloadSize: 1.15 MB |
| 5 | Gazette Notification for Publication of Draft TPS under Section 61(1) | DownloadSize: 980 KB |
| 6 | Gazette Notification for Sanction of Draft TPS u/s 68(2) | DownloadSize: 1.24 MB |
| 7 | Gazette Notification for Sanction of Draft TPS under Section 68(2) | DownloadSize: 1.24 MB |
| 8 | Gazette Notification for Publication of Preliminary TPS under Section 72(5) | DownloadSize: 1.06 MB |